Rearange on Primere

Started by Ultura, February 21, 2016, 11:39:23 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Ultura

Hi,
I've been working in  short documentary project. First of all for time gain I exported the raw files mov directly via mlrawviwer without any color correction. I made editing all files in premiere . My question is i'd like to do some grading with dng files but time line is so complicated with mov files. I need exact seconds which i made in premiere in mov files. How can i arrange all these files without open a new project . Any ideas?
Thanks..

DeafEyeJedi

Sounds like MLVFS can be what you need to speed up ur workflow without taking up too much space.
5D3.113 | 5D3.123 | EOSM.203 | 7D.203 | 70D.112 | 100D.101 | EOSM2.* | 50D.109

Ultura

Thanks for the reply.
I have another issue right know. My mov files and dng files don't match together. When i bring them to the timeline my mov file ( which i exported earlier with mlrawviewer) is 8 min. but my dng files which i converted them with aftereffects are 6 min. how could it be they are same clip but they don't match. It's a long shot and has m01 m02 files also. Is that be a problem but my mov files are ok.

Ultura

dng converted files are fast motion. But i arange the frame rate as 23,98 in the after