Quote from: sys73r on August 13, 2017, 09:56:45 PM
This is really nice, can you describe your postproduction workflow? did you create a 4K timeline and then just stretched it out?
Thank you.
MLV_DUMP all the MLV files to dngs. put them in individual folder (don't put the MLV files in the folder). Drag the folders to After effects. edit the dngs in the pop up RAW Editor. then create sequence for that each clips, make the sequence 23.99 fps. keep the original frame size. save the AE file. Create a UHD 23.99 fps sequence for the main video, load the AE file with all the sequences in. fit all the AE sequence to the frame. add music, title. Then output as 4k youtube.
Here is the workflow I am still experimenting. Not sure where I can shorten the process.